04-01-2013, 11:51 AM
In other areas I've also finished making the master for the underneath of the overhead modules. I was able to do a lot of kit bashing for the detailing work. I tried to follow the basic patterns on the original filming miniature as close as possible. I tried to find pieces that resembled what was on TMP Dock. I was able to make a single piece mold for this part. I then tried casting this piece and the results were fantastic. At this posting I was able to cast 14 of the panels for one of the Docks. As I brought out in my last month's update I am casting all of the parts in Black resin. This will reduce light leaks as well as the need for spraying all of the parts Flat Black. I have several pics posted of these panels. Check them out.
Along with the bottom panels I have also finished the master for the side walls of the Modules and have begun work on the front right and front left pieces where the landing bays are. I should have these pieces completely detailed as well as molds for casting the pieces. So check out the new pics in the April Updates Page and let me know what you think. Next Month's update should be awesome as well. See you then!
Happy modeling, Mark
http://www.NemVia.com
"... once it's activated, there's no way to stop it!" - Scotty - DMa

