01-17-2010, 04:35 PM
ok team its my weekend(thats starts Sundats) & Ive also got 10 days off! Time with the kids & building!!! So today got most of the add on pieces drilled. Broke about 8 drill bits in the process & am down to my last batch... Gonna need more cause I aint even started on the hulls
Have already threaded about 300-400ft of fibre optic & it aint even close to how much Im going to need
I started with 500ft. I guess Im going to need at least another 1000ft!
Thought Id get the engine LED's all wired up & couldn't resist a light test


Got way ahead of myself & will have to pull it apart as I need to fix the primer in the hulls & then install the Fibre Optic that will be around the lower cities etc before the engines can be hooked up. Its already a maze of wireing & is going to be chaotic once the other elements are installed. But we're seeing some idea of whats to be
Have already threaded about 300-400ft of fibre optic & it aint even close to how much Im going to need
I started with 500ft. I guess Im going to need at least another 1000ft!Thought Id get the engine LED's all wired up & couldn't resist a light test



Got way ahead of myself & will have to pull it apart as I need to fix the primer in the hulls & then install the Fibre Optic that will be around the lower cities etc before the engines can be hooked up. Its already a maze of wireing & is going to be chaotic once the other elements are installed. But we're seeing some idea of whats to be


