07-01-2018, 01:02 PM
JULY UPDATES - 2018
Back on track for this month! I was able to Finish off the top of the display base by tacking down the Velvet material so that is now set. I can now prepare to add the trim and begin work on the lighting controls. In This month's update I have made some lighting test shots of the light panels and mark lighting. But first I had to square off the frame of the drydock. This needed to be done because the added weight of the Enterprise was causing one side of the dock to sag. So I had to level off the top of the dock by adding a cable and a turnbuckle to help even things out. This also allowed me to make the side panels square with the rest of the dock.. Next I have to do some tweaking of the individual panels to make sure they are all straight. I am now running all of the ships wiring down the back of the support frame to the switch board which will control certain lighting effects on both the ship and the dock. The new pics are posted on the July Updates - 2018 page. For now you can use the pull down menu to the right of the menu bar and the page is at the bottom. The lighting test shots came out pretty good. Check 'em out and I'll see you on the next update.
Mark
Home
http://www.NemVia.net
Attached Thumbnails
Back on track for this month! I was able to Finish off the top of the display base by tacking down the Velvet material so that is now set. I can now prepare to add the trim and begin work on the lighting controls. In This month's update I have made some lighting test shots of the light panels and mark lighting. But first I had to square off the frame of the drydock. This needed to be done because the added weight of the Enterprise was causing one side of the dock to sag. So I had to level off the top of the dock by adding a cable and a turnbuckle to help even things out. This also allowed me to make the side panels square with the rest of the dock.. Next I have to do some tweaking of the individual panels to make sure they are all straight. I am now running all of the ships wiring down the back of the support frame to the switch board which will control certain lighting effects on both the ship and the dock. The new pics are posted on the July Updates - 2018 page. For now you can use the pull down menu to the right of the menu bar and the page is at the bottom. The lighting test shots came out pretty good. Check 'em out and I'll see you on the next update.
Mark
Home
http://www.NemVia.net
Attached Thumbnails
"... once it's activated, there's no way to stop it!" - Scotty - DMa

