i`ve been buildin this snowspeeder for 3 or 4 months now and it`s near the end of the build,stupidly i`ve not put it on earlier...
first off i added alot of detail to the cockpit with more fllight control panels and fibre optics in each one,there was be over 80 cables in it,
next i made some inner details for the maintenance areas and some of the grilled areas,
and i wanted it to appear that it`s floatin whilest it`s bein refuelled,
and finally i scratched up a flat loader and some cargo boxes and made a harpoon cable holder and a few crewmen,one of the crewmen has a torch in his hand which is some 2mm fibre optic cable which is threaded through his arm and through his torso and leg.

